Jump to content

Feng Shui (The 510 Experiment) (Pics fixed through page 7..)


Josh K.

Recommended Posts

  • Replies 2.5k
  • Created
  • Last Reply

Top Posters In This Topic

Top Posters In This Topic

Posted Images

So the Coil-Overs I'll be running are Troy Ermish's new Setup:

 

 

NEW STAGE 2 PERFORMANCE PACKAGE $1800-

 

 

 

Eight way adjustable dampner's front and rear. Custom valved dampner for a 510 with a 2 year warranty on the dampners. The NEW kit allows for ride adjustment with no effect on the shock travel. NO MORE BOTTOMING OUT!

 

 

10491_407263112686890_1274550250_n.jpg

 

 

 

 

The kit requires the front struts to be cut off 2 inches up from the spindle base, press on adapter tube and weld.

 

 

538403_407263182686883_660500782_n.jpg

 

 

Direct bolt in design for the rears, and bolt in design camber / caster adjustable fron plates.

 

 

556577_407263242686877_113398173_n.jpg

 

 

Close up of the adjustable camber & caster plates.

 

 

378354_407263472686854_763879916_n.jpg

 

 

call Troy for more information. 510-252-1001

Link to comment

I had to walk away for a few reasons. I just want something that works and at the time there was no good options. Troy was working on these at the same time and after some discussion I decided this was the best way moving forward. The price point for the FA coil overs was what I was wanting but sometimes you gotta pay more.....

 

-Josh

Link to comment

Thanks for the props!

 

I got the frontend welded on, took some creative tweaking of the front frame rails to get it right..... Still gotta do some finish work tomorrow and the rest will wait till the motor comes back out, just easier that way.

 

IMG_20120901_175457.jpg

 

IMG_20120901_175505.jpg

 

IMG_20120901_175510.jpg

 

IMG_20120901_175601.jpg

Link to comment

Still working on the quarter. Gotta finish some odds and ends...

 

IMG_20120903_120054.jpg

 

IMG_20120903_121817.jpg

 

IMG_20120903_122326.jpg

 

IMG_20120903_154454.jpg

 

IMG_20120903_175616.jpg

 

I wasn't gonna use the piece between the trunk and quarter but decided I should since it adds rigidity and also braces the bumper.

 

IMG_20120903_175600.jpg

 

Gotta finish this section.

 

IMG_20120903_175609.jpg

 

Decided I'm not gonna run the quarter all the way to the rocker flange. Gonna weld it right to the face of the rocker. This requires removing the egg shaped section of sheet metal to reduce filler. Still gotta finish this...

 

IMG_20120903_175651.jpg

  • Like 1
Link to comment
  • 1 month later...

Thanks Luke.

 

It's been a long time since I got to work on my car. Been busy building these http://community.ratsun.net/topic/48979-510-sedan-82-83-280zx-rear-disc-adapters-run-2/

 

I bought a 2000 Impreza RS R160 VLSD. After some research and thought I decided to use the stock Subaru CV's and just modify them. More on that later..... :ninja:

 

Here's the diff:

 

20121108_184812.jpg

Link to comment
  • 2 weeks later...

Looks like I lost a few post when the website went crazy.

 

So started with the Subi stubs and 510 axle flanges. I then cut the Subi stub and turned the diameter, then turned the 510 flanges round:

 

20121117_090449.jpg

 

And a set of VW Axles:

 

20121117_090455.jpg

 

Then designed the new flanges:

 

SIDE-3.jpg

 

ISO.jpg

 

Then started milling them. I would prefer to do this in the live tooled lathe but this is faster to setup:

 

20121117_115228.jpg

 

20121117_134617.jpg

 

20121117_134736.jpg

 

20121117_161726.jpg

 

20121117_161929.jpg

 

20121117_171645.jpg

 

20121117_171659.jpg

 

20121117_174900.jpg

 

20121117_174905.jpg

 

Just need to finish the outboard flanges tomorrow and weld them up. Then measure and send out the VW axles for shortening and re-spline.

 

Waiting on these to come back from Ano. Forsale in the parts for sale forum.....

 

20121111_154909.jpg

Link to comment

Wow, a lot of awesome work. Im digging the flares a lot too.

And I really want one of those water pump pulleys and the water neck!

I'm going to price material tomorrow for the Pulley's. The water neck I'll probably design and make out of billet on the CNC. Welding the cast is too unpredictable. Stay tuned!

 

Here's the finished Set. Just need welding. Going price material for these tomorrow also...... Gotta get my website going quick!

 

20121118_182821.jpg

Link to comment

I'm going to price material tomorrow for the Pulley's. The water neck I'll probably design and make out of billet on the CNC. Welding the cast is too unpredictable. Stay tuned!

 

Definitely let me know if you start making these, I want a set for sure!

Link to comment

Started fitting the adapters and Lokar cables. Here's the routing. Looks sick and avoids the sheetmetal plus routes through the stock ebrake hole....

 

20121123_193017.jpg

 

20121123_193028.jpg

 

20121123_193035.jpg

 

20121123_193104.jpg

 

20121123_193136.jpg

 

20121123_193143.jpg

 

20121123_193152.jpg

 

Couldn't be happier. Now to mount the other side and route and trim the cables and decide whether I want to use the Lokar handle I bought or the stock ebrake handle....

Link to comment
  • Josh K. changed the title to Feng Shui (The 510 Experiment) (Pics fixed through page 7..)

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Loading...
×
×
  • Create New...

Important Information

By using this site, you agree to our Terms of Use.