Benlt Posted July 22, 2012 Report Share Posted July 22, 2012 Finally got around to building a down pipe for the Z. More pics to come of complete system, as soon as it gets completed. Right now there is a 2' off the flex pipe which gets me just in front the the rear axle. I know the welds are show quality but there is good penetration. Im still learning, and this was my first experience using stainless. Quote Link to comment
Aaron Datsun Posted July 24, 2012 Report Share Posted July 24, 2012 Better than my welds, most of mine could easily make it into the fabrication fail thread. Quote Link to comment
Benlt Posted July 27, 2012 Author Report Share Posted July 27, 2012 HA thanks, I surpassed the "turkey shit" phase but Im still having trouble making consistant beads. Any way if anyone was wondering why the two parts look different; I took a leftover 240sx/ silvia sr20 Blitz downpipe and hacked it up. Hopefully il have an update soon, but the 520 is getting all my attn right now. Quote Link to comment
Benlt Posted July 27, 2012 Author Report Share Posted July 27, 2012 No sir, Shielded MIG. I ain't that fancy yet. Quote Link to comment
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.